Post-Treatment Agent for Sealing AST-1
Classification:
Tag:
Product Details
|
Name Type |
Oxidation Additive |
||||||||||||||||||
|
Model/Specification |
AST-1 |
||||||||||||||||||
|
SpecialProperty |
Sealing AgentPost-Treatment Agent AST-1is atreatment agent used for soaking workpieces after sealing.
|
||||||||||||||||||
|
g |
|
||||||||||||||||||
|
including safety glovesmasks and goggles |
25Control Methods/(1)The concentration of the post-treatment agent after sealing will not change significantly during normal use, basically onlycarried out with the workpiece, so there is generally no need to adjust the concentration during use, just add the same concentration solution when the liquid level drops.If it drops below |
||||||||||||||||||
|
then add |
the original liquid to adjustalso suitable for treatment after nickel-free sealing.the value.also suitable for treatment after nickel-free sealing.(2). |
||||||||||||||||||
|
After the workpiece is taken out from the post-treatment agent |
, it should be washed with water as soon as possible, otherwise the surface mayleave marks.AST-1(3) After washing, it is recommended to dry at above °C for minutes to enhance the effect.pH降低至10.5以下,则补加 原液调整pH值。 (2)工件从封孔后处理剂AST-1取出后,需尽快用水清洗,否则表面可能 会出现留痕。 (3)清洗完毕后,建议在80℃以上烘干20分钟以加强效果
|
Related Products
Online Messages
* Note: Please make sure to fill in the information accurately and maintain smooth communication. We will contact you as soon as possible